| Project # 1 |
|
| Project Title |
Construction of Mosque |
|
| Project No. |
2 |
|
| Funded by |
By cooperation and assistance of people |
|
| Location |
Kohat district (Sayed Ahmad khail village) of Nangarhar province |
|
| Starting date |
5/6/1996 |
|
| Ended date |
8/9/1996 |
|
| Duration |
3 months |
|
| Total Budget |
10000 USD |
|
| Project # 2 |
|
| Project Title |
Carpet Weaving income-generating |
|
| Project No. |
US/12/WSTA |
|
| Funded by |
USA |
|
| Location |
Takal Peshawor |
|
| Starting date |
5/6/1996 |
|
| Ended date |
6/9/1996 |
|
| Duration |
3 months |
|
| Total Budget |
12200 USD |
|
| Project # 3 |
|
| Project Title |
Bakery Project, Kabul City, Dis.4, |
|
| Project No. |
AFG/CD/K 99033/010/BAK ACTED |
|
| Funded by |
WFP Kabul & ACTED |
|
| Location |
Project in Kabul city |
|
| Starting date |
1-9-1997 |
|
| Ended date |
31/12/1997 |
|
| Duration |
4 months |
|
| Total Budget |
Per bread at 32 Af |
|
| Project # 4 |
|
| Project Title |
Bakery Project, Kabul City, Dis.3, |
|
| Project No. |
AFG/CD/K99033/010/BAK |
|
| Funded by |
WFP, Kabul |
|
| Location |
Project in Kabul city |
|
| Starting date |
16-11-1997 |
|
| Ended date |
19-Jan-1998 |
|
| Duration |
2 months |
|
| Total Budget |
Per bread at 32 Af |
|
| Project # 5 |
|
| Project Title |
Bakery Project Kabul City, Dis.4, |
|
| Project No. |
AFG/CD/K99033/010 |
|
| Funded by |
WFP |
|
| Location |
Distrect 4, Kabul city |
|
| Starting date |
1-1-1998 |
|
| Ended date |
30/12/1998 |
|
| Duration |
One year |
|
| Total Budget |
At 32 Af/bread |
|
| Project # 6 |
|
| Project Title |
Bakery Project, Kabul City, Dis.3, |
|
| Project No. |
AFG/CD/999033/010 |
|
| Funded by |
WFP Kabul |
|
| Location |
Distrect 11, 15 |
|
| Starting date |
1-1-1998 |
|
| Ended date |
30/12/1998 |
|
| Duration |
One year. |
|
| Total Budget |
Eeach bread for 50 Af |
|
| Project # 7 |
|
| Project Title |
Bakery project Kabul City Dis.11 and 15 |
|
| Project No. |
AFG/CD/K/999033/01 |
|
| Funded by |
WFP Kabul |
|
| Location |
11, 15 |
|
| Starting date |
1-5-1998 |
|
| Ended date |
30/12/1998 |
|
| Duration |
8 months. |
|
| Total Budget |
At 50 Af / bread |
|
| Project # 8 |
|
| Project Title |
Training and education courses income from the bakeries programs. |
|
| Project No. |
AFG/WSTA/3 |
|
| Funded by |
WSTA |
|
| Location |
Wazir Akber khan |
|
| Starting date |
5/8/1998 |
|
| Ended date |
16/8/1998 |
|
| Duration |
13 day |
|
| Total Budget |
1000 USD |
|
| Project # 9 |
|
| Project Title |
Winter cloths distribution for people |
|
| Project No. |
Sof/AFG/12/0/WSTA |
|
| Funded by |
Solidarities international NGOs |
|
| Location |
3rd district |
|
| Starting date |
1998 / January |
|
| Ended date |
5/1/1998 |
|
| Duration |
4 day |
|
| Total Budget |
Construction of WSTA |
|
| Project # 10 |
|
| Project Title |
Coal distribution |
|
| Project No. |
Nile |
|
| Funded by |
Focus International NGO |
|
| Location |
4th district |
|
| Starting date |
1-Feb-1998 |
|
| Ended date |
3-Feb-1998 |
|
| Duration |
3 day |
|
| Total Budget |
IP contrbution |
|
| Project # 11 |
|
| Project Title |
Coal distribution |
|
| Project No. |
AFG/CD/12304/02 |
|
| Funded by |
ACTED |
|
| Location |
3rd districts |
|
| Starting date |
1-Mar-1998 |
|
| Ended date |
3-Mar-1998 |
|
| Duration |
2 day |
|
| Total Budget |
IP Contribution |
|
| Project # 12 |
|
| Project Title |
Workshops for bakers |
|
| Project No. |
AFG/WSTA/3 |
|
| Funded by |
SBS |
|
| Location |
Kabul city |
|
| Starting date |
1998 |
|
| Ended date |
15/2/1998 |
|
| Duration |
6 days |
|
| Total Budget |
2500 USD |
|
| Project # 13 |
|
| Project Title |
Bakery project Kabul city district 11 & 15, |
|
| Project No. |
(ABS)AFG/CD/K/99033/0101/BAK/ACTED |
|
| Funded by |
WFP Kabul |
|
| Location |
11 & 15 district |
|
| Starting date |
31-May-1999 |
|
| Ended date |
31-Oct-1999 |
|
| Duration |
5 months |
|
| Total Budget |
Wheet flour for 23 bakeries |
|
| Project # 14 |
|
| Project Title |
Shelter project for returnees families |
|
| Project No. |
99/JAL/012/LAG/GO/WSTA |
|
| Funded by |
UNHCR / WFP |
|
| Location |
Qarghai district Laghman province. |
|
| Starting date |
13-12-1999 |
|
| Ended date |
14/03/2000 |
|
| Duration |
3 months |
|
| Total Budget |
745500 Rs |
|
| Project # 15 |
|
| Project Title |
Bakery project, Kabul city district 7, |
|
| Project No. |
AFG/CD/K99033/0101/BAK/ACTED |
|
| Funded by |
WFP Kabul |
|
| Location |
7th district |
|
| Starting date |
1-Jun-2000 |
|
| Ended date |
31 Aug .2000 |
|
| Duration |
3 months |
|
| Total Budget |
Receive in kind wheet flour |
|
| Project # 16 |
|
| Project Title |
Bakery project |
|
| Project No. |
AFG/CD/K/2001/117/0101/B/ACTED |
|
| Funded by |
WFP Kabul |
|
| Location |
7th 11th 15th in Kabul City |
|
| Starting date |
Junary 1st 2000 |
|
| Ended date |
May 31 st 2000 |
|
| Duration |
5 months |
|
| Total Budget |
58150 USD |
|
| Project # 17 |
|
| Project Title |
Shelter project for returnees’ families |
|
| Project No. |
01/AB/AFG/RP/370-01/JAL/G.03/WSTA |
|
| Funded by |
UNHCR / WFP |
|
| Location |
Qarghai district Laghman province. |
|
| Starting date |
27/02/2000 |
|
| Ended date |
25/06/2000 |
|
| Duration |
4 months |
|
| Total Budget |
12800 USD |
|
| Project # 18 |
|
| Project Title |
Shelter project for returnees families |
|
| Project No. |
01/KBL/013/G.03/WSTA |
|
| Funded by |
UNHCR / WFP |
|
| Location |
Shakardara district Kabul province. |
|
| Starting date |
6-May-2000 |
|
| Ended date |
9-Jun-2000 |
|
| Duration |
3 months |
|
| Total Budget |
32675 USD |
|
| Project # 19 |
|
| Project Title |
Shelter project for returnees families |
|
| Project No. |
01/KBL/38/KBL/G.O3/WSTA |
|
| Funded by |
UNHCR |
|
| Location |
Paghman district, Kabul province. |
|
| Starting date |
8-Jun-2001 |
|
| Ended date |
8-Sep-2001 |
|
| Duration |
3 months |
|
| Total Budget |
15600 USD |
|
| Project # 20 |
|
| Project Title |
Tailoring hygiene-education and literacy for widows |
|
| Project No. |
PA/UC/12/01/WSTA |
|
| Funded by |
UCLA/USA |
|
| Location |
Khyber plaza flat No 209 Arbab Road Peshawar Pakistan. |
|
| Starting date |
21/07/2001 |
|
| Ended date |
21/10/2001 |
|
| Duration |
3 months |
|
| Total Budget |
8000 US $ |
|
| Project # 21 |
|
| Project Title |
IDP Survey |
|
| Project No. |
Nil |
|
| Funded by |
UNHCR |
|
| Location |
Qarghai district, Laghman province |
|
| Starting date |
5/8/2001 |
|
| Ended date |
5/9/2001 |
|
| Duration |
1 month |
|
| Total Budget |
500 USD |
|
| Project # 22 |
|
| Project Title |
Distribution of Wheat |
|
| Project No. |
AFG/CD/K/99033/0101/BA |
|
| Funded by |
WFP |
|
| Location |
District 7, 11, 15 |
|
| Starting date |
1-Oct-2001 |
|
| Ended date |
30-Nov-2001 |
|
| Duration |
2 months |
|
| Total Budget |
Each loaf 50 Af |
|
| Project # 23 |
|
| Project Title |
Sweater Making Project for Women |
|
| Project No. |
Nil |
|
| Funded by |
UNHCR |
|
| Location |
Kabul province |
|
| Starting date |
15/12/2001 |
|
| Ended date |
21/01/2002 |
|
| Duration |
5 weeks |
|
| Total Budget |
58028.5 USD |
|
| Project # 24 |
|
| Project Title |
IDP Survey |
|
| Project No. |
02/KBL/002/EM/GAZ/B.28/CAR/WSTA/13 |
|
| Funded by |
UNHCR |
|
| Location |
Rasheedan district, Ghazni province |
|
| Starting Date |
1-Nov-2001 |
|
| Ended Date |
27/01/2002 |
|
| Duration |
3 months |
|
| Total Budget |
132480 Rs |
|
| Project # 25 |
|
| Project Title |
Tailoring hygiene-education and literacy for widows |
|
| Project No. |
PA/UC/12/01/WSTA |
|
| Funded by |
UCLA/USA |
|
| Location |
Khyber plaza flat No 209 Arbab Road Peshawar Pakistan. |
|
| Starting date |
25/12/2001 |
|
| Ended date |
25/2/2002 |
|
| Duration |
3 months |
|
| Total Budget |
8000 US $ |
|
| Project # 26 |
|
| Project Title |
Rapid Assessment and Emergency Distribution Program |
|
| Project No. |
02/GBL/EM/GAZ/B.28/CAR/WSTA |
|
| Funded by |
UNHCR/CARE |
|
| Location |
Ghazni Province |
|
| Starting date |
1/1/2002 |
|
| Ended date |
1/3/2002 |
|
| Duration |
3 months |
|
| Total Budget |
13,480.00 RS |
|
| Project # 27 |
|
| Project Title |
Cleaning and De-silting of irrigation channel |
|
| Project No. |
CFW-Aust AID-200-03 |
|
| Funded by |
Australian AID, CARE international |
|
| Location |
Gardez city, Paktya provice |
|
| Starting date |
20/01/2002 |
|
| Ended date |
21/04/2002 |
|
| Duration |
3 months |
|
| Total Budget |
1115952.50 Rs |
|
| Project # 28 |
|
| Project Title |
Sanitation of Gardez City |
|
| Project No. |
OFID/CARE/PUI/2002-03 |
|
| Funded by |
DFID/CARE |
|
| Location |
Gardez city, Paktiya province |
|
| Starting date |
03/02/2002 |
|
| Ended date |
3-Mar-2002 |
|
| Duration |
One month |
|
| Total Budget |
1072651 Rs |
|
| Project # 29 |
|
| Project Title |
Tailoring hygiene-education and literacy for widows |
|
| Project No. |
PA/UC/12/01/WSTA |
|
| Funded by |
UCLA/USA |
|
| Location |
Khyber plaza flat No 209 Arbab Road Peshawar Pakistan. |
|
| Starting date |
30/2/2002 |
|
| Ended date |
30/5/2002 |
|
| Duration |
3 months |
|
| Total Budget |
8000 US $ |
|
| Project # 30 |
|
| Project Title |
Constriction work for encashment center. |
|
| Project No. |
02/KBL/005/KBL/G.98/WSTA |
|
| Funded by |
UNHCR |
|
| Location |
Kabul City / Puli Charkhi |
|
| Starting date |
1-Apr-2002 |
|
| Ended date |
30-Jun-2002 |
|
| Duration |
3 months |
|
| Total Budget |
40225 USD |
|
| |
|
|
| v Construction of Shads, |
|
|
| v Construction of 44 Latrines |
|
|
| v Construction of 2 Bathrooms (Shower rooms) |
|
|
| v Water Supply System |
|
|
| v Electric System |
|
|
| v Graveling of Car Parking, Roads |
|
|
| v Reconstruction of office rooms |
|
|
| v Construction of Wooden box Size 3 x 4 m (6 No) |
|
|
| v Construction of Wooden box Size 2 x 2 m (No.) |
|
|
| v Drilling of one tube well |
|
|
| Project # 31 |
|
| Project Title |
Food for Work FOODAC project |
|
| Project No. |
Nil |
|
| Funded by |
WFP Kabul |
|
| Location |
Parwan Province, Shenwari District |
|
| Starting date |
01/04/2002 |
|
| Ended date |
31/06/2002 |
|
| Duration |
3 months |
|
| Total Budget |
USD 2400 and 214 MT Weet |
|
| Project # 32 |
|
| Project Title |
Maintenance for Transit center |
|
| Project No. |
02/KBL/007/KBL/G.98/WST |
|
| Funded by |
UNHCR Kabul |
|
| Location |
Kabul |
|
| Starting date |
15.5.2002 |
|
| Ended date |
15.6.2002 |
|
| Duration |
One month |
|
| Total Budget |
41206 USD |
|
| Project # 33 |
|
| Project Title |
Distribution BP – 5 Biscuits |
|
| Project No. |
CARE/2002/BPs/042/WSTA |
|
| Funded by |
CARE |
|
| Location |
Nahrin District Bahglan Province |
|
| Starting date |
21/05/2002 |
|
| Ended date |
21/11/2002 |
|
| Duration |
6 months |
|
| Total Budget |
Transportation Cost 1000 USD |
|
| Project # 34 |
|
| Project Title |
Supplementary Feeding BP-5 Biscuits for War Affected and Malnutrition Children |
|
| Project No. |
CARE/2002/BPs/043/WSTA |
|
| Funded by |
CARE |
|
| Location |
Kabul |
|
| Starting date |
21/05/2002 |
|
| Ended date |
20/11/2002 |
|
| Duration |
6 months |
|
| Total Budget |
IP Contribution |
|
| Project # 35 |
|
| Project Title |
Maintenance for Transit center |
|
| Project No. |
02/SB/AFG/RP/333 |
|
| Funded by |
UNHCR |
|
| Location |
Kabul City |
|
| Starting date |
1-Jun-2002 |
|
| Ended date |
30-Jun-2002 |
|
| Duration |
One month |
|
| Total Budget |
41396 USD |
|
| Project # 36 |
|
| Project Title |
Maintenance for Transit center |
|
| Project No. |
02/KBL/009/KBL/G.98/WST |
|
| Funded by |
UNHCR |
|
| Location |
Kabul City |
|
| Starting date |
1-Jul-2002 |
|
| Ended date |
31-Dec-2002 |
|
| Duration |
Six months |
|
| Total Budget |
16991 USD |
|
| Project # 37 |
|
| Project Title |
Women Tailoring, Embroidering and Literacy Programs |
|
| Project No. |
CARE-RAP-Tailoring-partnership-016 |
|
| Funded by |
CARE, Afghanistan/EU |
|
| Location |
Gardiz City |
|
| Starting date |
25/6/2002 |
|
| Ended date |
30/10/2002 |
|
| Duration |
4 months |
|
| Total Budget |
7876 USD |
|
| Project # 38 |
|
| Project Title |
Constriction of Maintenance of Transit Center |
|
| Project No. |
02/KBL/009/KBl/G.98/WST. |
|
| Funded by |
UNHCR |
|
| Location |
Park-i-Sanahti in Kabul |
|
| Starting date |
1-Jul-2002 |
|
| Ended date |
31/12/2002 |
|
| Duration |
5 Months |
|
| Project # 39 |
|
| Project Title |
Shelter Project for Returnees families |
|
| Project No. |
02/SB/AFG/RP/333(b$/CARE-WSTA-09. |
|
| Funded by |
UNHCR/CARE |
|
| Location |
Jaghori District of Ghazni Province |
|
| Starting date |
10/08/002, |
|
| Ended date |
15/12/2002 |
|
| Duration |
3 Months |
|
| Total Budget |
16000 USD |
|
| Project # 40 |
|
| Project Title |
Construction of Shinbul Girls High School & 6 Wash Culverts. |
|
| Project No. |
01-05-NSP-WB/JSDF/CARE |
|
| Funded by |
NGO’s Support Program (NSP)/CARE |
|
| Location |
Shiber District Bamiyan Province |
|
| Starting date |
11/8/2002 |
|
| Ended date |
11/12/2002 |
|
| Duration |
4 months |
|
| Total Budget |
43519 USD |
|
| Project # 41 |
|
| Project Title |
Shelter Project for Returnees families |
|
| Project No. |
02/SB/ AFG/RP/330 |
|
| Funded by |
UNHCR |
|
| Location |
Mehterlam District, Laghman Province |
|
| Starting date |
01/09/002 |
|
| Ended date |
30/11/2002 |
|
| Duration |
3 Months |
|
| Total Budget |
12605 USD |
|
| Project # 42 |
|
| Project Title |
Shelter Assistance. |
|
| Project No. |
02/KB/AFG/RP/02/MEH/034/LAG/GO3/WSTA |
|
| Funded by |
UNHCR |
|
| Location |
Mehterlam distrect, Laghman |
|
| Starting date |
1-Sep-2002 |
|
| Ended date |
31-Oct-2002 |
|
| Duration |
2 months |
|
| Total Budget |
8100 USD |
|
| Project # 43 |
|
| Project Title |
Shelter Project for Returnees families |
|
| Project No. |
AFG/Sh/99031/01/WSTA |
|
| Funded by |
UNHCR |
|
| Location |
Mohammad Raqi District Kapisa Province |
|
| Starting date |
22-Sep-2002 |
|
| Ended date |
22/12/2002 |
|
| Duration |
3 Months |
|
| Total Budget |
16000 USD |
|
| Project # 44 |
|
| Project Title |
Construction two Culverts one footbridge |
|
| Project No. |
File #: 39-3-2003-08 |
|
| Funded by |
Canada fund Cods is: FC:AF.244 |
|
| Location |
Logar Province M. Aghah district |
|
| Starting date |
29-Sep-2002 |
|
| Ended date |
30-Dec-2002 |
|
| Duration |
3 Months |
|
| Total Budget |
1158209 Rs |
|
| Project # 45 |
|
| Project Title |
Rehabilitation of Azrat Ali High school. |
|
| Project No. |
AUS AID/CARE/2002-02 |
|
| Funded by |
CARE |
|
| Location |
Sia Gird district, Parwan province. |
|
| Starting date |
20/10/2002 |
|
| Ended date |
20/2/2003 |
|
| Duration |
4 months |
|
| Total Budget |
35462 USD |
|
| Project # 46 |
|
| Project Title |
Income Generation Tailoring |
|
| Project No. |
CARE-RAP-Tailoring-partnership 028 |
|
| Funded by |
SAVE/CARE UK |
|
| Location |
Waghaz, Qarabagh, Jaghori/Ghazni |
|
| Starting date |
10/01/2003 |
|
| Ended date |
11/7/2003 |
|
| Duration |
6 months |
|
| Total Budget |
14948 USD |
|
| Project # 47 |
|
| Project Title |
Maintenance & runing of transit center in Kabul city. |
|
| Project No. |
03/KBL/G98/WSTA. |
|
| Funded by |
UNHCR |
|
| Location |
Kabul city, Kabul province. |
|
| Starting date |
1-Mar-2003 |
|
| Ended date |
30 Nov. 2003 |
|
| Duration |
9 months |
|
| Total Budget |
21987 USD |
|
| Project # 48 |
|
| Project Title |
Kareze Rehabilitation and Provision of Irrigation and Potable Water |
|
| Project No. |
39-3-2003-46 |
|
| Funded by |
CARE/CIDA |
|
| Location |
Dashti Dalil Villages Mohad Agha district Lugar province |
|
| Starting date |
19/3/2003 |
|
| Ended date |
1/7/2003 |
|
| Duration |
3 months |
|
| Total Budget |
1591419 Rs |
|
| Project # 49 |
|
| Project Title |
Distribution Agriculture seed Project |
|
| Project No. |
Nil |
|
| Funded by |
Embassy of French |
|
| Location |
Parwan Province, Ghorband District |
|
| Starting date |
1/4/2003 |
|
| Ended date |
1/5/2003 |
|
| Duration |
1 month |
|
| Total Budget |
WSTA Contribution |
|
| Project # 50 |
|
| Project Title |
Distribution Agriculture seed Project |
|
| Project No. |
|
|
| Funded by |
Embassy of French |
|
| Location |
Bamiyan Province, Shaber District |
|
| Starting date |
1/4/2003 |
|
| Ended date |
1/5/2003 |
|
| Duration |
1 month |
|
| Total Budget |
WSTA Contribution |
|
| Project # 51 |
|
| Project Title |
Shelter Project for 140 Returnees families |
|
| Project No. |
03/SV/AFG/RP/330(03/JAL/08/NGA/GO3/WSTA |
|
| Funded by |
UNHCR |
|
| Location |
Mehterlam District, Laghman Province |
|
| Starting date |
17/04/003 |
|
| Ended date |
18/7/2003 |
|
| Duration |
3 Months |
|
| Total Budget |
31017 USD |
|
| Project # 52 |
|
| Project Title |
Construction of Mohd Khel Primary School |
|
| Project No. |
06-AETF2002-NL-2-CARE-2 |
|
| Funded by |
UNAMA/CARE |
|
| Location |
Paktika Province Sharan city |
|
| Starting date |
25/04/2003 |
|
| Ended date |
25/8/2003 |
|
| Duration |
4 months |
|
| Total Budget |
37929 USD |
|
| Project # 53 |
|
| Project Title |
Shelter Project for Returnees families |
|
| Project No. |
03/SB/AFG/RP/330(r$ |
|
| Funded by |
UNHCR |
|
| Location |
Mehterlam and Alishang district, Laghman Province |
|
| Starting date |
15/5/2003 |
|
| Ended date |
15-Jul-2003 |
|
| Duration |
2 months |
|
| Total Budget |
37810 USD |
|
| Project # 54 |
|
| Project Title |
Tailoring Training, Health Education and Literacy program |
|
| Project No. |
04-AF294-03/SB/AFG/RP/336 (d$ ) |
|
| Funded by |
UNHCR/CARE |
|
| Location |
Ghazni City |
|
| Starting date |
10/06/2003 |
|
| Ended date |
11/10/2003 |
|
| Duration |
4 Months |
|
| Total Budget |
32980 USD |
|
| Project # 55 |
|
| Project Title |
Self Supportive Poultry Training for 300 widows |
|
| Project No. |
03/KBL/013/PWN/N.22/WST |
|
| Funded by |
UNHCR/Kabul |
|
| Location |
Siagerd District of Parwan Province |
|
| Starting date |
1-Jul-2003 |
|
| Ended date |
30-Sep-2003 |
|
| Duration |
3 months |
|
| Total Budget |
49760 USD |
|
| Project # 56 |
|
| Project Title |
Shelter Project for Returnees families |
|
| Project No. |
Nil |
|
| Funded by |
UNHCR/INTERSOS |
|
| Location |
Kot District Jalalabad Province |
|
| Starting date |
08/08/003 |
|
| Ended date |
8-Nov-2003 |
|
| Duration |
3 months |
|
| Total Budget |
5914 USD |
|
| Project # 57 |
|
| Project Title |
Shelter Project for Returnees families |
|
| Project No. |
03/KBL/015/PWN/G.03/HRR (4 NGOs) |
|
| Funded by |
UNHCR |
|
| Location |
Siagerd District, Parwan Province |
|
| Starting date |
15 Agust 2003 |
|
| Ended date |
14-Nov-2003 |
|
| Duration |
3 Months |
|
| Total Budget |
49690 USD |
|
| Project # 58 |
|
| Project Title |
Provision of potable water installation of hand pumps |
|
| Project No. |
24-AF294-03/SB/AFG/RP/336 (d$) |
|
| Funded by |
UNHCR/CARE |
|
| Location |
Ghazni province |
|
| Starting date |
26/8/2003 |
|
| Ended date |
31/12/2003 |
|
| Duration |
4 months |
|
| Total Budget |
77087 USD |
|
| Project # 59 |
|
| Project Title |
Construction of Bahrilullom Boys and Girls primary School |
|
| Project No. |
06-AETF2002 -NL-2-CARE-2 |
|
| Funded by |
CARE/CIDE |
|
| Location |
Paktiya Province Yousof Khill district |
|
| Starting date |
1-Sep-2003 |
|
| Ended date |
31/12/2003 |
|
| Duration |
4 Months |
|
| Total Budget |
1674710 Rs |
|
| Project # 60 |
|
| Project Title |
Construction of irrigation flume & cleaning of canal project |
|
| Project No. |
03/KBL/035/PWN/N.12/WSTA |
|
| Funded by |
UNHCR Kabul |
|
| Location |
Siagerd district of Parwan province |
|
| Starting date |
1-Nov-2003 |
|
| Ended date |
01/01/2004 |
|
| Duration |
2 months |
|
| Total Budget |
42917 USD |
|
| Project # 61 |
|
| Project Title |
Maintanance and runing of transit center. |
|
| Project No. |
03/KBL/03/KBL/G.98/WSTA |
|
| Funded by |
UNHCR/Kabul |
|
| Location |
Kabul city/Kabul |
|
| Starting date |
1-Dec-2003 |
|
| Ended date |
31-Aug-2004 |
|
| Duration |
9 months |
|
| Total Budget |
21987 USD |
|
| Project # 62 |
|
| Project Title |
Construction of Laigan School |
|
| Project No. |
101-40-NSP/JSDF/WB/MRRD/CARE |
|
| Funded by |
MRRD /CARE |
|
| Location |
Bamyan Province Waras District |
|
| Starting date |
2/.5/2004 |
|
| Ended date |
5/9/2004 |
|
| Duration |
4 months |
|
| Total Budget |
$ 67508 |
|
| Project # 63 |
|
| Project Title |
Shelter Project for Returnees families |
|
| Project No. |
02-AFG024-04/AB/AFG/RP/376(d$. |
|
| Funded by |
UNHCR/CARE |
|
| Location |
Jaghori District of Ghazni Province |
|
| Starting date |
04/.5/2004 |
|
| Ended date |
08/8/2004 |
|
| Duration |
3 Months |
|
| Total Budget |
USD 13500 |
|
| Project # 64 |
|
| Project Title |
Shelter Project for Returnees families |
|
| Project No. |
03/SB/AFG/RP/330-03/MHT/008/LAG/G03/WSTA |
|
| Funded by |
UNHCR Jalalabad |
|
| Location |
Qargh-I Alishang District of Lagman province |
|
| Starting date |
26/.5/2004 |
|
| Ended date |
30/8/2004 |
|
| Duration |
3 months |
|
| Total Budget |
USD 33000 |
|
| Project # 65 |
|
| Project Title |
Shelter project for Returnees |
|
| Project No. |
04/AB/AFG/RP/370 |
|
| Funded by |
UNHCR |
|
| Location |
Behsud & surkhroad of Nengarhar. |
|
| Starting date |
1-Jun-2004 |
|
| Ended date |
1-Dec-2004 |
|
| Duration |
6 months |
|
| Total Budget |
75192 USD |
|
| Project # 66 |
|
| Project Title |
Tailoring & Health Education for Women |
|
| Project No. |
IOM KBL 131 |
|
| Funded by |
IOM, International organization for Migration |
|
| Location |
Gilan District Ghazni province |
|
| Starting date |
1-Jun-2004 |
|
| Ended date |
30-Sep-2004 |
|
| Duration |
4 months |
|
| Total Budget |
15862 US $ |
|
| Beneficiries |
Total Beneficiaries: 150 Shelter |
|
| Project # 67 |
|
| Project Title |
Renovation of the UNHCR guest house |
|
| Project No. |
LPO/ AF /KAB/04/099 PR reference AFG/OCM/04/0019 of 12/05/2004 |
|
| Funded by |
UNHCR |
|
| Location |
Guest house in Bamiyan Province |
|
| Starting date |
18/6/2004 |
|
| Ended date |
18-Jul-2004 |
|
| Duration |
One month |
|
| Total Budget |
15352 USD |
|
| 1. Drilling of one well |
|
|
| 2. Wiring of 20 room 8 Corridors |
|
|
| 3. Water supply system for kitchen and latrines |
|
|
| 4. Completely painting of office rooms and gust house |
|
|
| 5. Making windows and doors |
|
|
| 6. Wooden lining of 20 rooms ceiling |
|
|
| Project # 68 |
|
| Project Title |
Construction of 35 Water points (Tube Wells) and 50 Latrines implementation of Hygiene Education and operation maintenance programs |
|
| Project No. |
04/WSTA/AFG/MRRD/UNHCR/UNDP/07 |
|
| Funded by |
MRRD / UNHCR |
|
| Location |
Parwan Province , Bagram district |
|
| Starting date |
4-Aug-2004 |
|
| Ended date |
19/11/2004 |
|
| Duration |
3 Months |
|
| Total Budget |
U%%EDITORCONTENT%%nbsp; 74290 |
|
| Project # 69 |
|
| Project Title |
Construction of 15 Water points ( Tube Wells ) and 30 Latrines implementation of Hygiene Education and operation maintenance programs |
|
| Project No. |
04/ WSTA/ AFG/ MRRD/UNHCR/UNDP/12 |
|
| Funded by |
MRRD / UNHCR |
|
| Location |
Ghazni Province , Qarabagh district |
|
| Starting date |
4-Aug-2004 |
|
| Ended date |
19/10/2004 |
|
| Duration |
2 Months |
|
| Total Budget |
U%%EDITORCONTENT%%nbsp; 29149 |
|
| Project # 70 |
|
| Project Title |
Shelter project for Returnees Families |
|
| Project No. |
04/AB/AFG/RP/370 |
|
| Funded by |
UNHCR Jalalabad |
|
| Location |
Qarghi, Alishang District of Lagman Province |
|
| Starting date |
1-Sep-2004 |
|
| Ended date |
30/11/2004 |
|
| Duration |
3 Months |
|
| Total Budget |
USD 33000 |
|
| Project # 71 |
|
| Project Title |
Construction of 7 Water points (Tube Wells ) and operation maintenance Programs. |
|
| Project No. |
Nil |
|
| Funded by |
MRRD/UNOPS |
|
| Location |
Ghazni province, Khogyani district |
|
| Starting date |
14/07/1383 28/Sep/2004 |
|
| Ended date |
14/08/1383 28/Oct/2004 |
|
| Duration |
1 Month |
|
| Total Budget |
US $ 15526 |
|
| Project # 72 |
|
| Project Title |
Construction of 10 Water points ( Tube Wells ) and 16 Latrines implementation of Hygiene Education and operation maintenance programs |
|
| Project No. |
04/ WSTA/AFG/ MRRD/UNHCR/UNDP/12 |
|
| Funded by |
MRRD / UNHCR |
|
| Location |
Ghazni Province. |
|
| Starting date |
25/11/2004 |
|
| Ended date |
30/12/2004 |
|
| Duration |
1 Month |
|
| Total Budget |
19220 USD |
|
| Assistance of 100 pairs of clothes for children and women from WSTA budget to department of women affairs in Ghazni province on account of world women day. |
| Total Budget: 300 USD |
| Assistance of 340 pairs of clothes for women & children to All over women Union from WSTA budget 1140 USD, on account of world women day. |
| Total Budget: 1140 USD |
| Project # 73 |
|
| Project Title |
Construction of district building, building for accommodation staffs, Police office building and one mosque |
|
| Project No. |
ASP/ZNK/GHZ/1383/056 |
|
| Funded by |
ASP |
|
| Location |
Zana khan district, Ghazni province |
|
| Starting date |
1384 |
|
| Ended date |
After 6 months |
|
| Duration |
6 months |
|
| Total Budget |
14871658 Af |
|
| Administration Building. |
|
|
| Total Budget |
6517199 Af |
|
| Police building |
|
|
| Total Budget |
6077991 Af |
|
| Mosque |
|
|
| Total Budget |
938284 Af |
|
| House |
|
|
| One house budget |
565751 Af |
|
| Tow house budget |
1130302 Af |
|
| Septic Tauk |
|
|
| Total Budget |
207880 Af |
|
| Project # 74 |
|
| Project Title |
Shelter project for returnees families |
|
| Project No. |
05/AB/AFG/RP/370 |
|
| Funded by |
UNHCR Jalalabad |
|
| Location |
Qarghaee, Alishang District of Lagman Province |
|
| Starting date |
1-Apr-2005 |
|
| Ended date |
3-Aug-2005 |
|
| Duration |
3 Months |
|
| Total Budget |
43830 USD |
|
| Project # 75 |
|
| Project Title |
350 Shelter project |
|
| Project No. |
05/AB/AFG/RP/370 |
|
| Funded by |
UNHCR |
|
| Location |
Alingar & Qarghayi districts, Laghman province. |
|
| Starting date |
1st April, 2005 |
|
| Ended date |
31st October, 2005 |
|
| Duration |
7 months |
|
| Total Budget |
81950 USD |
|
| Project # 76 |
|
| Project Title |
Construction of Naswan Safidak primary school |
|
| Project No. |
CARE/EDU/CGSD/SCHC/BAM-005 |
|
| Funded by |
CARE |
|
| Location |
Yakawlang district/ Bamyan province |
|
| Starting date |
13/04/2005 |
|
| Ended date |
17/7/2005 |
|
| Duration |
3 months |
|
| Total Budget |
100384 USD |
|
| Project # 77 |
|
| Project Title |
Carpet/Glim Weaving for women. |
|
| Project No. |
PRTGDZ018 |
|
| Funded by |
PRT/IOM |
|
| Location |
Ghazni Center (Ghazni Women’s Recourse Center) |
|
| Starting date |
1-Jul-2005 |
|
| Ended date |
31-Dec-2006 |
|
| Duration |
6 months |
|
| Total Budget |
10481 USD |
|
| Project # 78 |
|
| Project Title |
Construction of 11 new water tube wells with installation of 11 new hand pumps and implementation of hygiene education. |
|
| Project No. |
SDCMMA002 |
|
| Funded by |
IOM |
|
| Location |
Ghalbala area of Almar district, Faryab province |
|
| Starting date |
4-Jul-2005 |
|
| Ended date |
4 / Oct /2005 |
|
| Duration |
3 months. |
|
| Total Budget |
33220 USD |
|
| Project # 79 |
|
| Project Title |
Construction of 7 new water tube wells and implementation of hygiene education. |
|
| Project No. |
OFDAKBL003 |
|
| Funded by |
IOM. |
|
| Location |
Faryab province, Almar district, Khoja gawar village |
|
| Starting date |
July 4th, 2005 |
|
| Ended date |
October 3rd , 2005 |
|
| Duration |
3 months |
|
| Total Budget |
39143 USD |
|
| Project # 80 |
|
| Project Title |
Construction of 1 water pipe scheme and implementation of hygiene education. |
|
| Project No. |
OFDAKBL013 |
|
| Funded by |
IOM |
|
| Location |
Gulan Village, Chack district, Wardak province. |
|
| Starting date |
10 July, 2005 |
|
| Ended date |
October 10th, 2005 |
|
| Duration |
3 months |
|
| Total Budget |
47957 USD |
|
| Project # 81 |
|
| Project Title |
Construction of Pipe Scheme and implementation of hygiene education. |
|
| Project No. |
OFDAMZR002 |
|
| Funded by |
IOM |
|
| Location |
Bahrab village, Marmul district, Balkh province. |
|
| Starting date |
July 27th 2005 |
|
| Ended date |
October 26th 2005 |
|
| Duration |
3 months |
|
| Total Budget |
34346 USD |
|
| Project # 82 |
|
| Project Title |
Construction of Pipe Scheme and implementation of hygiene education. |
|
| Project No. |
OFDAKBL013 |
|
| Funded by |
IOM |
|
| Location |
Chak district, Wardak Province |
|
| Starting date |
July.27.2005 |
|
| Ended date |
31/12/2005 |
|
| Duration |
5 months |
|
| Total Budget |
47957 USD |
|
| Project # 83 |
|
| Project Title |
Shelter Assistancde for returnees |
|
| Project No. |
05/AB/AFG/RP/370(U$)05/NRG/NGR/N/19WSTA |
|
| Funded by |
UNHCR |
|
| Location |
Qarghaye district of Laghman province. |
|
| Starting date |
1st of December 2005 |
|
| Ended date |
28th February2006 |
|
| Duration |
3 month |
|
| Total Budget |
1223 USD |
|
| Project # 84 |
|
| Project Title |
Vecational Trainings for 450 women |
|
| 1- |
Tailoring training for 180 women |
|
| 2- |
Beading training for 45 women |
|
| 3- |
Sheep breeding for 225 women |
|
| Project No. |
ALP-E Micro-enter prise project |
|
| Funded by |
RELIEF International |
|
| Location |
Laghman province |
|
| Starting date |
March 28.2006 |
|
| Ended date |
May 28.2006 |
|
| Duration |
2 months |
|
| Total Budget |
101236.50 USD ( From which 2160 USD for personnel, 14960.8 USD, for tailoring 5543.8 for beading and 70511.4 USD, for live stock breeding and 8060.8 USD for admin cost.) |
|
| Project # 85 |
|
| Project Title |
Shelter Assistance for returnees and IDPs |
|
| 1- |
200 Shelter in Laghman province |
|
| 2- |
320 Shelter in Nengarhar province |
|
| 3- |
174 Shelter in Konar province |
|
| Project No. |
06/AB/AFG/RP/370(H$) |
|
| Funded by |
UNHCR |
|
| Location |
Behsud district of Nengarhar province, Qarghaee district of Laghman province and Narang-Chawakai districts of Kunar province. |
|
| Starting date |
1st April 2006 |
|
| Ended date |
30st Noveber 2006 |
|
| Duration |
9 months |
|
| Total Budget |
143918 USD |
|
| Project # 86 |
|
| Project Title |
Sanitation, Hygiene education, Operation and maintenance. |
|
| Project No. |
NRRD/0151/WATSAN |
|
| Funded by |
MRRD/UNHCR |
|
| Location |
Faryab Province |
|
| Starting date |
10 September, 2006 |
|
| Ended date |
10 December, 2006 |
|
| Duration |
3 months |
|
| Total Budget |
29360 USD |
|
| Project # 87 |
|
| Project Title |
Sanitation Hygiene education, Operation and maintenance. |
|
| Project No. |
MRRD/0151/WATSAN |
|
| Funded by |
MRRD/UNHCR |
|
| Location |
Kunduz province. |
|
| Starting date |
10 September, 2006 |
|
| Ended date |
10 December, 2006 |
|
| Duration |
3 months |
|
| Total Budget |
29360 USD |
|
| Project # 88 |
|
| Project Title |
Sanitation Hygiene education, Operation and maintenance. |
|
| Project No. |
MRRD/0151/WATSAN |
|
| Funded by |
MRRD/UNHCR |
|
| Location |
Baghlan province. |
|
| Starting date |
10 September, 2006 |
|
| Ended date |
10 December, 2006 |
|
| Duration |
3 months |
|
| Total Budget |
29360 USD |
|
| Project # 89 |
|
| Project Title |
239 Shelter Assistance for Returnees & IDPs. |
|
| Project No. |
06/AB/AFG/RP/370 |
|
| Funded by |
UNHCR |
|
| Location |
Tangi Behsood of Nengarhar province. |
|
| Starting date |
15.11.2006 |
|
| Ended date |
End of 2006 |
|
| Duration |
1.5 months |
|
| Total Budget |
8610 USD |
|
| Project # 90 |
|
| Project Title |
Monitoring Shelter and EVI Project in the Central Region |
|
| Project No |
07-AB-AFG-RP-373 |
|
| Funded by |
UNHCR |
|
| Location |
Ghazni & Logar Provinces |
|
| Starting Date |
1-Apr-2007 |
|
| Ended Date |
31-12-2007 |
|
| Duration |
9 Months |
|
| Total Budget |
39030 USD |
|
| Project # 91 |
|
| Project Title |
Shelter Assistance for 475 Returnees families and Hygiene |
|
| Project No. |
07/AB/AFG/RP/370 |
|
| Funded by |
UNHCR |
|
| Location |
Laghman & Nangarhar Provinces |
|
| Starting date |
1.5.2007 |
|
| Ended date |
31.12.2007 |
|
| Duration |
8 months |
|
| Total Budget |
146023.75 USD |
|
| Project # 92 |
|
| Project Title |
Shelter Assistance for 1090 Returnees Families and Hygiene |
|
| Project No |
ooooooo131 |
|
| Funded by |
UNHCR |
|
| Location |
Laghman & Nangarhar Provinces |
|
| Starting Date |
1-May-2008 |
|
| Ended Date |
31-12-2008 |
|
| Duration |
8 Months |
|
| Total Budgeyt |
471694 USD |
|
| Project # 93 |
|
| Project Title |
Shelter Assistance for 290 Returnees Families |
|
| Project No. |
IRC/EH/2008/EC 227 |
|
| Funded by |
ECHO/IRC |
|
| Location |
Laghman and Nangarhar provinces. |
|
| Starting date |
7th Sep. 2008 |
|
| Ended date |
7 Feb.2009 |
|
| Duration |
6 months |
|
| Total Budget |
337696 USD |
|
| Project # 94 |
|
| Project Title: |
Shelter Assistance for 70 Returnees families |
|
| Project No: |
IRC/EH/2008/EC227 |
|
| Funded By: |
ECHI/IRC |
|
| Location: |
Paktya province |
|
| Starting date: |
7th Sep.2008 |
|
| Ended date: |
7th Dec.2008 |
|
| Duration: |
4 month |
|
| Total Budget |
84967 USD |
|
| Project # 95 |
|
| Project Title: |
Shelter Assistance for 18 shelters |
|
| Project No: |
IRC/EH/2008/EC 227 |
|
| Funded By: |
ECHO/IRC |
|
| Location: |
Nangarhar province |
|
| Starting date: |
01.03.2009 |
|
| Ended date: |
15.04.2009 |
|
| Duration: |
1.5 month |
|
| Total Budget |
21390.1 USD |
|
| Project # 96 |
|
| Project title: |
Shelter Assistance & Hygiene Program for Returnees Families |
|
| Project No: |
08/AB/AFG/RP/370(33020370) |
|
| funded By: |
UNHCR-SOJ |
|
| Location: |
Nangarhar & Laghman provinces |
|
| Starting date: |
1st May.2009 |
|
| Ended date: Oc.2009 |
31/10/2009 |
|
| Duration: |
6 months |
|
| Total Budget: |
591900 USD |
|
| Total Beneficiary: |
930 |
|
| Project # 97 |
|
| Project title: |
Winterization Assistance for Returnees Families & Laghman, Nangarhar and Kunar Provinces |
|
| Project No: |
08/AB/AFG/RP/370(33020370) |
|
| funded By: |
UNHCR-SOJ |
|
| Location: |
GTZ |
|
| Starting Date: |
1/11/2009 |
|
| Ended Date |
31-12-2009 |
|
| Duration |
2 Months |
|
| Total Budget: |
200217 |
|
| Total Beneficiaries: 4110 |
|
|
| Project # 98 |
|
| Project Title: |
Eastern Region Shelter project (Subgrant) |
|
| Project No: |
IRC/EHE/2009/09/10 |
|
| Funded By: |
ECHO/IRC |
|
| Location: |
Nangarhar & Laghman Provinces |
|
| Starting date: |
1 Nov.2009 |
|
| Ended date: |
30-Apr-10 |
|
| Duration: |
6 Months |
|
| Total Budget |
3829068 USD |
|
| Total Beneficiary 292 |
|
|
| Project # 99 |
|
| Project title: |
Shelter Assistance Hygiene Program for Returnees & Families |
|
| Project No: |
ooooooo293 |
|
| funded By: |
UNHCR-SOJ |
|
| Location: |
Nangarhar and Laghman provinces |
|
| Starting Date: |
1-May-2010 |
|
| Ended date: |
31-Dec-2010 |
|
| Duration: |
8 Months |
|
| Total Budget: |
1282211 USD |
|
| Total Beneficiaries: 2380 Shelter Units |
2301 Shelter Unit |
|
| Project # 100 |
|
| Project title: |
Strinthening Local Capacity to lead Emergency Response |
|
| Project No: |
AID-OFDA-G-10-00097 |
|
| funded By: |
USAID/IRC |
|
| Location: |
Laghman and Nangarhar provinces |
|
| Starting Date: |
Oct.1.2010 |
|
| Ended date: |
June.30.2011 |
|
| Duration: |
9 Months |
|
| Total Budget: |
49123 USD |
|
| Project # 101 |
|
| Project title: |
Shelter Assistance Hygiene Program in Nangarhar Province |
|
| Project No: |
OOOOOOO370 |
|
| funded By: |
UNHCR-SOJ |
|
| Location: |
Nangarhar Province |
|
| Starting Date: |
1. May. 2011 |
|
| Ended date: |
31. 12. 2011 |
|
| Duration: |
8 Months |
|
| Total Budget: |
1222214 USD |
|
| Project # 102 |
|
| Project title: |
Implementation of CFW / IGA projects |
|
| Project No: |
OOOOOOO410 |
|
| funded By: |
UNHCR-SOK |
|
| Location: |
Aliceghan, Barikab and Qarabagh districts of Kabul province |
|
| Starting Date: |
15. 9. 2011 |
|
| Ended date: |
31. 12. 2011 |
|
| Duration: |
3 Months |
|
| Total Budget: |
335491 USD |
|
| Project # 103 |
|
| Project title: |
Emergency Response project in Eastern Region |
|
| Project No: |
AID-OFDA-G-10-00097 |
|
| funded By: |
IRC |
|
| Location: |
Nangarhar province |
|
| Starting Date: |
September. 15. 2011 |
|
| Ended date: |
June. 14. 2012 |
|
| Duration: |
9 months |
|
| Total Budget: |
50000 USD |
|
| Project # 104 |
|
| Project title: |
Procurement of one Ambulance for Aliceghan clinic and one Coaster bus for transportation facilities |
|
| Project No: |
000,000,0410 |
|
| funded By: |
UNHCR-SOK |
|
| Location: |
Barikab of Qarabagh district |
|
| Starting Date: |
15.9.2011 |
|
| Ended date: |
15.10.2011 |
|
| Duration: |
One month |
|
| Total Budget: |
82600 USD |
|
| Project # 105 |
|
| Project title: |
Installation of street lights |
|
| Project No: |
000,000,0410 |
|
| funded By: |
UNHCR-SOK |
|
| Location: |
Barikab-Aliceghan of Qarabagh district |
|
| Starting Date: |
15.9.2011 |
|
| Ended date: |
20.10.2011 |
|
| Duration: |
35 days |
|
| Total Budget: |
65702 USD |
|
| Project # 106 |
|
| Project title: |
Wash construction |
|
| Project No: |
000,000,0410 |
|
| funded By: |
UNHCR-SOK |
|
| Location: |
Qala -i- Gudar |
|
| Starting Date: |
15.9.2011 |
|
| Ended date: |
24.12.2011 |
|
| Duration: |
3 months |
|
| Total Budget: |
35175 USD |
|
| Project # 107 |
|
| Project title: |
Cement Block Making Training |
|
| Project No: |
000,000,0410 |
|
| funded By: |
UNHCR-SOK |
|
| Location: |
Aliceghan LAS |
|
| Starting Date: |
15.9.2011 |
|
| Ended date: |
15.12.2011 |
|
| Duration: |
3 months |
|
| Total Budget: |
56303 USD |
|
| Project # 108 |
|
| Project title: |
Road upgrading |
|
| Project No: |
000,000,0410 |
|
| funded By: |
UNHCR-SOK |
|
| Location: |
Qala -i- Gudar |
|
| Starting Date: |
15.9.2011 |
|
| Ended date: |
24.12.2011 |
|
| Duration: |
3 months |
|
| Total Budget: |
74390 USD |
|
| Project # 109 |
|
| Project title: |
Water supply scheme upgrading |
|
| Project No: |
000,000,0410 |
|
| funded By: |
UNHCR-SOK |
|
| Location: |
Barikab LAS |
|
| Starting Date: |
15.11.2011 |
|
| Ended date: |
15.02.2012 |
|
| Duration: |
3 months |
|
| Total Budget: |
53322 USD |
|
| Project # 110 |
|
| Project title: |
Winterization program |
|
| Project No: |
000,000,0410 |
|
| funded By: |
UNHCR-SOK |
|
| Location: |
Central Region |
|
| Starting Date: |
15.10.2011 |
|
| Ended date: |
31.12.2011 |
|
| Duration: |
2.5 months |
|
| Total Budget: |
352150 USD |
|
| Project # 111 |
|
| Project tittle: |
Construction of Water points |
|
| Project No.: |
497 |
|
| Funded by: |
UNHCR- SOK |
|
| Location: |
Central region (Kabul “15 wells”, Logar “16 wells |
|
| |
” Maidan-Wardak”40 wells”, Ghazni” 8 wells”) |
|
| Starting date: |
June 1/2012 |
|
| Ended date: |
31-10-2012 |
|
| Duration: |
5 months |
|
| Total budget: |
390285 $ |
|
| Project # 112 |
|
| Project tittle: |
Gabion weaving training and Construction |
|
| |
flood protection wall |
|
| Project No.: |
497 |
|
| Funded by: |
UNHCR- SOK |
|
| Location: |
Kapisa province |
|
| Starting date: |
June 1/2012 |
|
| Ended date: |
30-09-2012 |
|
| Duration: |
4 months |
|
| Total budget: |
218208 $ |
|
| Project # 113 |
|
| Project Title: |
Construction of 39 potable water wells |
|
| Funded by: |
IRA-Islamic relife Afghanistan |
|
| Location: |
Surrounding ditricts of Kabul |
|
| Starting date: |
30/9/2012 |
|
| Ended Date: |
30/11/2012 |
|
| Total budget |
2777534 Afghanis |
|
| Project # 114 |
|
| Project Title: |
Distribution of winterization packages |
|
| Project No.: |
497 |
|
| Funded by: |
UNHCR-SOK |
|
| Location: |
Central region |
|
| Starting date: |
1st November 2012 |
|
| Ended Date: |
31-12-2012 |
|
| Total budget |
233490 USD |
|
| Project # 115 |
|
| Project Title: |
916 Meters Protection wall gabiob weaving Project |
|
| Funded by: |
UNHCR |
|
| Location: |
Parwan Province |
|
| Starting date: |
1-May-2013 |
|
| Ended Date: |
30-9-2013 |
|
| Total budget |
458265 USD |
|
| Project # 116 |
|
| Project Title: |
Water Project |
|
| Funded by: |
UNHCR |
|
| Location: |
Kabul Province |
|
| Starting date: |
1-May-2013 |
|
| Ended Date: |
30-6-2013 |
|
| Total budget |
69651 USD |
|
| Project # 117 |
|
| Project Title: |
Emergency shelter for 225 families in Kunar |
|
| Funded by: |
UNOCHA |
|
| Location: |
Sawki, khas Kunar,Norgal and Narang District of Kunar Province |
|
| Starting date: |
10-Jul-2013 |
|
| Ended Date: |
10-Dec-2013 |
|
| Total budget |
496387 USD |
|
| Project # 118 |
|
| Project Title: |
Winterization selection |
|
| Funded by: |
UNHCR |
|
| Location: |
Kabul, Kapisa, Parwan, Panjsheer, Logar, Maidan Wardak and Ghazni Provinces |
|
| Starting date: |
21.Sep.2013 |
|
| Ended Date: |
21.Oct.2013 |
|
| Total budget |
6100 USD |
|
| Project # 119 |
|
| Project Title: |
Winterization Distribution Assistant |
|
| Funded by: |
UNHCR |
|
| Location: |
Kabul Province |
|
| Starting date: |
15-Dec-2013 |
|
| Ended Date: |
24-Dec-2013 |
|
| Project # 120 |
|
| Project Title: |
Winterization Distribution Assistant |
|
| Funded by: |
UNHCR |
|
| Location: |
Maidan Wardak Province |
|
| Starting date: |
1-Dec-2013 |
|
| Ended Date: |
4-Dec-2013 |
|
| Project # 121 |
|
| Project Title: |
Winterization Distribution Assistant |
|
| Funded by: |
UNHCR |
|
| Location: |
Panjsheer Province |
|
| Starting date: |
3-Dec-2013 |
|
| Ended Date: |
4-Dec-2013 |
|
| Project # 122 |
|
| Project Title: |
Winterization Distribution Assistant |
|
| Funded by: |
UNHCR |
|
| Location: |
Logar Province |
|
| Starting date: |
8-Dec-2013 |
|
| Ended Date: |
12-Dec-2013 |
|
| Project # 123 |
|
| Project Title: |
Winterization Distribution Assistant |
|
| Funded by: |
UNHCR |
|
| Location: |
Kapisa Province |
|
| Starting date: |
11-Dec-2013 |
|
| Ended Date: |
12-Dec-2013 |
|
| Project # 124 |
|
| Project Title: |
Winterization Distribution Assistant |
|
| Funded by: |
UNHCR |
|
| Location: |
Ghazni Province |
|
| Starting date: |
1-Jan-2014 |
|
| Ended Date: |
5-Jan-2014 |
|
| Project # 125 |
|
| Project Title: |
Winterization Distribution Assistant |
|
| Funded by: |
UNHCR |
|
| Location: |
Parwan Province |
|
| Starting date: |
30-Dec-2013 |
|
| Ended Date: |
2-Jan-2014 |
|
| Total budget |
326900 USD |
|
| Project # 126 |
|
| Project Title: |
Permanent Shelter for 235 Families |
|
| Funded by: |
IOM |
|
| Location: |
Kuner Province |
|
| Starting date: |
15-12-2013 |
|
| Ended Date: |
31-03-2014 |
|
| Total budget |
627662 USD |
|
| Project # 127 |
|
| Project Title: |
Permanent Shelter for 230 Families |
|
| Funded by: |
UNHCR |
|
| Location: |
Kabul and Loger Provinces |
|
| Starting date: |
1-May-2014 |
|
| Ended Date: |
31-Oct-2014 |
|
| Total budget |
79970 USD |
|
| Project # 128 |
|
| Project Title: |
Water Points for IDPs |
|
| Funded by: |
UNHCR |
|
| Location: |
Logar,Ghazni and Maidan Wardak |
|
| Starting date: |
1-May-2014 |
|
| Ended Date: |
15-Jul-2014 |
|
| Total budget |
1042463 USD |
|
| Project # 129 |
|
| Project Title: |
Monitoring & Profiling of IDPs |
|
| Funded by: |
UNHCR |
|
| Location: |
Regional Provinces |
|
| Starting date: |
1-Jan-2015 |
|
| Ended Date: |
31-Dec-2015 |
|
| Total budget |
157860 USD |
|
| Project # 130 |
|
| Project Title: |
Emergency Food Distribution |
|
| Funded by: |
WFP |
|
| Location: |
Kapisa Province |
|
| Starting date: |
1-Mar-2015 |
|
| Ended Date: |
30-Jun-2015 |
|
| Total budget |
573402 AFG |
|
| Project # 131 |
|
| Project Title: |
Water Points & Community Center |
|
| Funded by: |
UNHCR |
|
| Location: |
Kabul & Parwan |
|
| Starting date: |
1-Jun-2015 |
|
| Ended Date: |
31-Jul-2015 |
|
| Total budget |
77370 USD |
|
| Project # 132 |
|
| Project Title: |
Poultry & Tailoring Project |
|
| Funded by: |
UNHCR |
|
| Location: |
Kapisa |
|
| Starting date: |
1-Sep-2015 |
|
| Ended Date: |
31-Dec-2015 |
|
| Total budget |
81510.60 USD |
|
| Project # 133 |
|
| Project Title: |
Winterization Assistance for IDPs |
|
| Funded by: |
UNHCR |
|
| Location: |
CR Provinces |
|
| Starting date: |
15-Nov-2015 |
|
| Ended Date: |
31-Dec-2015 |
|
| Total budget |
390000 USD |
|
| Project # 134 |
|
| Project Title: |
IDP Protection Monitoring |
|
| Funded by: |
UNHCR |
|
| Location: |
CR Provinces |
|
| Starting date: |
1-Jan-2016 |
|
| Ended Date: |
31-Dec-2016 |
|
| Total budget |
201816 USD |
|
| Project # 135 |
|
| Project Title: |
WFP Emergency Activities for Central Region |
|
| Funded by: |
UN-WFP |
|
| Location: |
Central Region |
|
| Starting date: |
16-Feb-2016 |
|
| Ended Date: |
16-Feb-2017 |
|
| Total budget |
601728 AFG |
|
| Project # 136 |
|
| Project Title: |
Food for Work |
|
| Funded by: |
UN-WFP |
|
| Location: |
Kapisa Province |
|
| Starting date: |
1-Mar-2016 |
|
| Ended Date: |
30-Apr-2016 |
|
| Total budget |
403090 AFG |
|
| Project # 134 |
|
| Project Title: |
Livelihood Project |
|
| Funded by: |
UNHCR |
|
| Location: |
Kabul, Kapisa, Parwan & Maidan Wardak |
|
| Starting date: |
1-Apr-2016 |
|
| Ended Date: |
31-Dec-2016 |
|
| Total budget |
313791.73 USD |
|