Establishment and Operation of 23 Community Bakeries in Ghazni Province, Afghanistan

Introduction

 

Watan’s Social and Technical Service Association (WSTA) is a humanitarian organization, established in 1992 for the purpose of humanitarian assistance to Afghans in Pakistan and Afghanistan. WSTA has been registered with the Ministry Economy and is permitted to operate all over the country. Our vision is that all people in Afghanistan will have access to basic needs such as emergency food, water, shelter, education, health facilities and job opportunities. WSTA is committed to enhance the empowerment of communities through: restoration of obliterated public welfare systems, irrigation systems, forming animal raising farms, improvement of handicraft and smaller local industries, women empowerment activities, protection of IDPs & returnees and struggle with gender inequality.

 

Scope of Work

 

This Scope of Work (SoW) provides a detailed outline of the work and responsibilities for suppliers to support the establishment and operation of the 23 community bakeries. The selected contractors will provide goods, services and support in line with the project’s needs as specified in the budget, including the construction, repair and maintenance of bakeries, as well as the provision of bakery tools and ingredients. The objective of this project is to enhance food security and strengthen social cohesion in the Jaghori and Central Ghazni districts of Ghazni Province by establishing 23 community bakeries (CBs). The project will address the immediate food needs of vulnerable populations by providing consistent access to bread, while promoting community engagement, empowerment and social protection. The intervention will also foster a protection-enabling environment for men, women, children and persons with disabilities, ensuring they can exercise their fundamental rights, including access to humanitarian assistance and freedom of movement.

 

Key Deliverables

  1. Procurement and Delivery of Bakery Tools and Equipment
  • Bakery Tools: Provide all necessary bakery tools and equipment, including but not limited to ovens, mixers, bread molds, knives and weighing scales.
  • Oven Installation: Install 23 commercial ovens, ensuring proper functionality, safety measures and durability for baking operations.
  • Packaging and Storage Equipment: Supply materials for packaging (e.g., bags, trays) and appropriate storage solutions (e.g., shelves, containers) for ingredients and finished products.
  1. Bakery Construction and Maintenance
  • Building Construction: Provide the necessary construction services for the establishment of 23 bakery buildings. This includes site preparation, foundation work and overall structure construction that meets local safety standards and regulations.
  • Ongoing Bakery Repair, Support and Maintenance: Repair and upgrade existing bakeries where necessary, ensuring they are functional and safe for food production.
  1. Supply of Raw Materials
  • Wheat Flour: Provide consistent and reliable supplies of high-quality wheat flour for baking, meeting local quality standards and project specifications.
  • Baking Ingredients: Supply additional ingredients, including but not limited to baking soda, salt and other essential ingredients for bread production.
  • Cooking Gas: Supply and deliver cooking gas for bakery ovens and other equipment, ensuring timely delivery and availability at each bakery.
  1. Logistical Support and Transportation
  • Transportation Services: Provide transportation for all supplies, equipment and materials to the 23 bakery locations in Jaghori and Central Ghazni districts.
  • Delivery Timelines: Ensure that all deliveries are made on time, as per agreed schedules, to prevent delays in the bakery construction and operational activities.
  • Storage and Handling: Proper handling and storage of materials, ensuring no spoilage, damage, or loss of supplies during transportation.

 

Specific Responsibilities of Suppliers and Logistic Service Providers

  • Construction Materials: Provide high-quality construction materials for building bakery structures, including concrete, steel, bricks and other essential building materials.
  • Bakery Tools and Equipment: Deliver all necessary tools and equipment for bakery operations, including ovens, mixers and storage containers. These should be durable, energy-efficient and tailored for local conditions.
  • Bakery Ingredients: Ensure the supply of essential baking ingredients, such as wheat flour, salt and baking soda, in bulk quantities as required for the bakery operations.
  • Transportation of Equipment and Materials: Safely transport all bakery equipment, construction materials and ingredients to each bakery site.
  • Timely Delivery: Adhere to agreed timelines for the delivery of all materials to ensure the smooth implementation of the project without delays.
  • Storage and Handling: Provide adequate warehousing and handling services for materials awaiting transport to ensure they remain in good condition.

 

Duration of Work

The project is expected to span a period of 5 months. Contractors must adhere to the following milestones:

  • Phase 1: Delivery and installation of bakery equipment and tools.
  • Phase 2: Completion of bakery construction and repair works.
  • Phase 3: Ongoing supply of raw materials and maintenance services as per contract terms.

 

Performance and Quality Standards

  • Compliance: All work and services provided should meet the local regulations and international standards where applicable.
  • Quality Assurance: Suppliers must guarantee the quality and durability of bakery tools and equipment. All construction and repair work must be inspected and approved by relevant local authorities.
  • Sustainability: Suppliers should aim to use environmentally friendly materials and practices where possible, minimizing the environmental impact of the project.

 

Reporting and Communication

  • Progress Reports: Contractors will submit regular progress reports to the project manager, documenting completed work and any challenges encountered.
  • Communication: Contractors must maintain open and timely communication with WSTA throughout the project, including providing updates on delivery schedules, construction progress and any issues related to the supply of materials.

 

Acceptance Criteria

The project will be considered complete when all 23 bakeries are operational, fully equipped and stocked with necessary ingredients. The installation and construction should meet all technical specifications outlined in the contract and the bakeries should be ready to start operations.

 

Payment Terms

  • Payment will be made according to the project phases, upon successful completion of each milestone and after the delivery of specified materials and services.
  • Final payment will be contingent upon the satisfactory inspection and approval of the completed bakeries and equipment installations.

 

Please see the below tables in Annex-“B” for specifications and details.

Kindly Provide your quoted prices in the same Annex-“B”.

 

General Instruction to Bidders

  • Bidders shall have the required, below mentioned resources serviceable and deliver them to the mentioned location at the date and time provided by WSTA.
  • Quotation’s cover letter must be signed by the entity’s authorized person. Using the template available in Annex-“A”.
  • Bidders shall fill the attached Bill of Quantity in Annex-“B” to submit the quotes, all prices shall only be quoted in United States Dollars (USD). ITB received in any currency other than United States Dollars (USD) will not be considered.
  • Bidders shall have relevant experience of providing similar services in the form of recognizable documents.
  • Bidders shall provide both financial and technical documents through sealed and stamped envelopes.
  • In case of price incongruity among unit price, total price, subtotal price and grand total price, the grand total price shall prevail to further stages.
  • The rates quoted shall be for complete resources, inclusive of all taxes and all charges for the services contingent to the work.
  • WSTA has the rights to increase/decrease the quantities mentioned in this ITB as needed in compliance with the project requirements through formal communications/negotiations.
  • WSTA reserves the right to award the deal to one or several entities, or none of them at all, depending upon the needs of the project.
  • Bidders shall have the valid business license to operate in Afghanistan.
  • WSTA reserves the right to accept the whole or part of your offer.
  • Incomplete offers or offers which do not comply with our tender conditions will not be considered.

 

Government Contract Withholding Tax

 

In accordance to “Article 72” of the “Afghanistan Tax Law” effective since May 2010, WSTA is required to withhold “contractor” taxes from the gross amounts payable to all Afghan for-profit contractors/providers. In accordance with this requirement, WSTA shall withhold two percent (2%) tax from all gross invoices of the contractors/providers with active AISA or Ministry of Commerce license. For sources without an active AISA or Ministry of Commerce license, WSTA shall withhold seven percent (7%) taxes as per current “Afghanistan Tax Law”.

The prospected contractor shall provide a copy of the organization’s AISA or Ministry of Commerce license and TIN (Tax Identification Number), along with submitting this ITB. Amounts deducted from the invoices will be forwarded to the Revenue Department of the Ministry of Finance credited to the firm’s TIN. Records of payments to the Ministry of Finance shall be maintained on file with WSTA.

 

Termination of Agreement

 

WSTA reserves the right to at any point terminate the agreement with the contractor after being granted following this ITB, through an official notice (as outlined in the agreement) to the authorized person of the contractor. Whenever the contractor does not perform and deliver in accordance with the contract or is not acceptable due to even non-operational reasons by WSTA, the management of WSTA has the authority to terminate the contract.

 

Conflict of Interest Declaration

 

The following steps outlines WSTA’s selection process and should be understood by all bidders to ensure transparency of awards and avoid conflict of interest:

 

  • Once the quotations are received, offerings’ prices are evaluated for reasonableness, accuracy and completeness.
  • The best value offer is selected based on a combination of both technical and financial score whereas the lowest price substantially compliant will be selected.
  • No activity can be started until vetting and other formalities are completed and both WSTA and the awardee have signed a formal contract.
  • At no time is it appropriate, nor legal, for contractors or beneficiaries to offer any WSTA staff member commissions, softeners or inducements of any kind. If a WSTA employee is found taking commissions, softeners or inducements of any kind or engaging in fraud of any kind, their employment contract with WSTA will be immediately terminated and their actions will be officially reported to the directorate whereas the offer of that bidder will also be dismissed.
  • The supplier may report unethical, illegal and corrupt practices of any kind to WSTA’s directorate.

 

Payment

 

  • Payment will be made to the supplier through cash or cheque and if possible, through bank transfer after the delivery of the mentioned services.
  • The contractor’s payment schedule will be directly correlated with the receipt of installments from funding agencies, whereas late installments from the funding agency will reflect on contractor’s payment schedule.
  • WSTA will not be responsible for any bank service or transfer charges.

 

Download